Skip to main content

Event planner

Event Planning Checklist

Choose your type of event and add the date. We list what to do and when, from booking to collection, and you can print it or save it as a PDF.

Your event

The list changes for each type, for example exhibitions are collected at breakdown.

Add it to see a real date for every task. For a show, the day it opens.

Leave blank for a one-day event.

Checklist: Wedding or wedding reception

16 tasks.

  1. 8 weeks before

    • Confirm the venue and the date, and book your equipment provisionally.
    • Peak dates book up early: summer Saturdays (July and August especially), December from late October, and conferences from September to November. If your date is in one of these, book now.
  2. 6 weeks before

    • Finalise the layout and check the room or site measurements. Set your quantities, with about 10% spare.
    • Place your order online. Prices and live stock are on every product page, and you can choose your dates and postcode before you pay.
    • Orders over £1,000 with delivery more than 28 days away can pay a 25% advance deposit, with the balance due 28 days before delivery. There is no security deposit on delivered orders.
  3. 4 weeks before

    • Used the 25% advance deposit? The balance is due 28 days before delivery. Cancelling more than 28 days before delivery gets a 75% refund, 14 to 28 days 50%, and under 14 days no refund.
  4. 2 weeks before

    • Update your order with the confirmed guest numbers. Keep a few spares if numbers are still moving.
  5. 1 week before

    • Last chance to add items: extras can usually be added up to 7 days before delivery, if stock allows. Items cannot be removed once an order is confirmed.
    • Confirm delivery access with the venue: the delivery window, the loading bay and the largest vehicle it takes, goods lift size and weight limit, and parking for our van. Our drivers cannot carry items up or down stairs, so delivery must be at ground level or by loading bay or lift.
  6. 2 days before

    • Outdoors? Make the weather call. Name one person to decide on plan B (more side panels, moving inside) and brief your staff and suppliers.
  7. The day before (delivery day)

    • Delivery day. We always deliver the day before your event, never on the day itself. You get a live tracking text when the van is on its way.
    • Check everything when it arrives and tell us straight away about anything missing or damaged, so we can put it right before your guests arrive. Switch hired fridges on as soon as they arrive: they need 6 to 8 hours to get cold.
    • Set up tables and chairs where the venue allows it. It takes longer than most people expect. We deliver and collect only (dry hire): we do not set up.
  8. On the day

    • Have everything in place at least 2 hours before guests arrive. Put one person in charge of empty glasses and breakages, and keep broken-glass tubs behind the bar.
  9. After the event (collection)

    • Count everything before collection. Stack crockery, cutlery and glassware back in their crates unwashed: Send It Back Dirty is a mandatory charge of 25% of the standard 3-day hire value on crockery, cutlery and glassware, and we wash everything at our depot. Furniture should be clean and dry.
    • Collection is normally the day after your event. You do not need to be there, as long as our driver can reach the equipment in the agreed place (at your own risk while it is unattended).

Where this comes from: our event checklists and hire policies (checklist-rules v1 (29 Nov 2026)). Dates are counted back from your event date; delivery is always the day before.

How the checklist works

Each task is set a number of weeks or days before your event, and the checklist turns that into a real date once you add yours. The tasks come from our event checklists for weddings, parties, Christmas parties, conferences, outdoor events and exhibition stands, and from our hire policies.

Two dates anchor everything. We always deliver the day before your event, never on the day itself. We collect the day after, except at exhibitions, where we collect from your stand at breakdown when the show closes.

A worked example

A wedding on Saturday 12 June 2027 gets its first tasks on Saturday 17 April (8 weeks before): confirm the venue and book provisionally. The order goes in by Saturday 1 May (6 weeks before). Final numbers go in on Saturday 29 May. Delivery is on Friday 11 June and collection on Sunday 13 June. Because Sunday is a weekend date, the checklist warns that a weekend surcharge normally applies to carriage.

What the checklist does not cover

  • Licences, insurance and permissions beyond the road closure note for street parties. Check with your venue and council.
  • Catering, entertainment and staffing. It covers the equipment you hire from us.
  • Exact quantities. Use the table and chair calculator and the glassware calculator for those.

For more detail, read our wedding reception checklist, corporate event checklist, outdoor event checklist and exhibition stand furniture guide, or see all our planning guides.

Questions

When should I book event hire equipment?

About 6 to 8 weeks before your event, and earlier for summer Saturdays, December parties and conferences between September and November. Popular items book up first on those dates.

When will my equipment be delivered?

We always deliver the day before your event, never on the day itself, and collect the day after. At exhibitions we deliver during build-up and collect from your stand at breakdown.

Can I add items after I have ordered?

Usually, yes, up to 7 days before delivery if stock allows. Items cannot be removed once an order is confirmed.

Do I have to wash crockery and glasses before collection?

No. Stack them back in their crates unwashed and we wash them at our depot. Send It Back Dirty is a mandatory charge of 25% of the standard 3-day hire value on crockery, cutlery and glassware.

Can I save the checklist?

Yes. Print it from your browser, or download it as a PDF. Each checklist also has its own web address that you can bookmark or share.

Calculated with planner-engine 1.0.0 (29 Nov 2026).